Pacifier JC-236
Description: Installation steps for interface adaptation: First, confirm the size of the greenhouse film interface (or pipe port) that needs to be connected. The bottom sleeve of JC-235 should match the inner diameter of the interface. Insert the sleeve: Insert one en...
Mobile:+86 18932779078 +86 15720271119
Email:feng18932779078@qq.com
Product Description:
Adaptation interface: First confirm the size of the greenhouse film interface (or pipe port) that needs to be connected, and the bottom sleeve of JC-235 needs to match the inner diameter of the interface.
Insert the sleeve: Insert one end of the bottom sleeve of the pacifier into one of the greenhouse membrane interfaces (or pipe end), and push hard until the sleeve is fully embedded.
Docking with another port: Align the other membrane interface (or pipe end) with the other side sleeve of the nipple, insert with equal force, and confirm that both ends are tightly fitted.
Check the sealing: After installation, gently pull both ends to confirm that the connection is firm and not loose; If used for greenhouse film splicing, it can be further fixed with card slots.
-
Greenhouse Curtain Hooks: How to Hang Screens and Partitions Without Rust
2026-10
-
Greenhouse Centrifugal Humidifiers: How to Choose the Right Atomizer for Summer Cooling
2026-10
-
Greenhouse Accessories: The Complete Buyer's Guide to Greenhouse Parts and Fittings
2026-10
-
Greenhouse Supporting Rollers, Bearing Wheels, and Dragging Wheels Guide
2026-09